Send Message
Hygartech Manufacturing Co., Ltd.
Hygartech Manufacturing Co., Ltd.
products
Home /

products

Nickel Plated Metal Brass DIY OEM Parts , Female Thread Full Port Ball Valve

Product Details

Place of Origin: CHINA

Brand Name: HYGARTECH or Customer's Brand

Payment & Shipping Terms

Minimum Order Quantity: Negotiable

Price: Negotiable, US$, €, RMB

Delivery Time: in 45 days after your confirmed the order

Payment Terms: T/T, irrevocable L/C at sight

Supply Ability: 200,000 PCS/Month

Get Best Price
Contact Now
Specifications
Highlight:

brass ball valve

,

brass quick coupler

Brand:
Packed By Customer's Brand
Material:
Brass
Color:
Nickel Plated
Packing:
As Below
Produced:
Brass By Forging
Handle:
Wing Type
Connection:
IPS Female Thread
Surface:
Nickel Plated
Brand:
Packed By Customer's Brand
Material:
Brass
Color:
Nickel Plated
Packing:
As Below
Produced:
Brass By Forging
Handle:
Wing Type
Connection:
IPS Female Thread
Surface:
Nickel Plated
Description
Nickel Plated Metal Brass DIY OEM Parts , Female Thread Full Port Ball Valve

Brass Female Thread Full Port Ball Valve OEM with Aluminum Wing Handle

* Brass construction, MS 58 by forging.

* Full port flow, female thread ends.

* Aluminum wing type handle powder coated.

* Working pressure max 25 Bar (350Psi).

* We offer the other designs by customer's requirements.

 

Picture Art No. Description & size Inner Pack Master Pack
Nickel Plated Metal Brass DIY OEM Parts , Female Thread Full Port Ball Valve 0

 

77-321

77-323

Brass Full Part Ball Valve

1/2" FIP

3/4" FIP

 

10

10

 

80

60

 

FAQ

Q1. Are you a factory or trading company?

We are one of professional manufacture in Metal Water Spray Gun, Hose Holder, Hose Cart and Hose Connector.

 

Q2. Where is your factory located?

Our Company is located in Xiamen, southeast of China.

 

Q3. How can I get some samples?

We would like to offer samples after you have confirmed the prices. However, customer should bear the cost of sample delivery.

 

Q4. What is your payment term?

We accept the payment by T/T, L/C and D/P. However, if the payment is T/T or D/P, it is necessary to be paid 30% in advance when you have confirmed the order.

 

Q5. What’s your delivery time?

For the most of products, we don’t make deposits. The date of shipment will be in 40 days.

 

Q6. How dose your factory do regarding quality control?

Quality is our life. We would take our best effort to control the quality of our products. Every article will be inspected individually. Customer’s requirement is the most important for our business.

Send your inquiry
Please send us your request and we will reply to you as soon as possible.
Send