Send Message
Hygartech Manufacturing Co., Ltd.
Hygartech Manufacturing Co., Ltd.
products
Home /

products

Zinc Alloy Fluid Control Ball Valve Die Cast Rough Chrome Plated Finish

Product Details

Place of Origin: CHINA

Brand Name: HYGARTECH or Customer's Brand

Payment & Shipping Terms

Minimum Order Quantity: Negotiable

Price: Negotiable, US$, €, RMB

Delivery Time: in 45 days after your confirmed the order

Payment Terms: T/T, irrevocable L/C at sight

Supply Ability: 200,000 PCS/Month

Get Best Price
Contact Now
Specifications
Highlight:

metal ball valve

,

brass quick coupler

Brand:
Packed By Customer's Brand
Material:
Zinc Alloy
Color:
Chrome Plated
Packing:
As Below
Produced:
Zinc Alloy
Connection:
Hose X Hose
Surface:
Chrome Plated
Application:
Fluid Control
Brand:
Packed By Customer's Brand
Material:
Zinc Alloy
Color:
Chrome Plated
Packing:
As Below
Produced:
Zinc Alloy
Connection:
Hose X Hose
Surface:
Chrome Plated
Application:
Fluid Control
Description
Zinc Alloy Fluid Control Ball Valve Die Cast Rough Chrome Plated Finish

Metal Ball Valve OEM with Hose Sleeve Ends for Wind Power Plant Industry

* Metal zinc construction by die cast.

* Brass stem and teflon seat and seals.

* Working pressure max 16 Bar (200Psi).

* Rough chrome plated finish.

 

Picture Art No. Description & size Inner Pack Master Pack
Zinc Alloy Fluid Control Ball Valve Die Cast Rough Chrome Plated Finish 0

 

76-116

76-119

76-125

76-132

Brass Easy Connect Click Quick Coupling

16 x 16mm hose

19 x 19mm hose

25 x 25mm hose

32 x 32mm  hose

 

10

10

10

10

 

120

80

60

40

 

FAQ

Q1. Are you a factory or trading company?

We are one of professional manufacture in Metal Water Spray Gun, Hose Holder, Hose Cart and Hose Connector.

 

Q2. Where is your factory located?

Our Company is located in Xiamen, southeast of China.

 

Q3. How can I get some samples?

We would like to offer samples after you have confirmed the prices. However, customer should bear the cost of sample delivery.

 

Q4. What is your payment term?

We accept the payment by T/T, L/C and D/P. However, if the payment is T/T or D/P, it is necessary to be paid 30% in advance when you have confirmed the order.

 

Q5. What’s your delivery time?

For the most of products, we don’t make deposits. The date of shipment will be in 40 days.

 

Q6. How dose your factory do regarding quality control?

Quality is our life. We would take our best effort to control the quality of our products. Every article will be inspected individually. Customer’s requirement is the most important for our business.

Send your inquiry
Please send us your request and we will reply to you as soon as possible.
Send